国产大片av I 久久久久人妻啪啪一区二区 I 伊人春色成人网 I 久久综合给合久久狠狠狠色97 I 天堂av资源在线观看 I 亚洲成av不卡无码无码不卡 I 国产欧美日韩视频怡春院 I 成年片色大黄全免费软件到 I 免费毛片一区二区三区久久久毛片 I 在线中文字幕网站 I 色欲av伊人久久大香线蕉影院 I 色婷综合 I 亚av I 丁香社区五月天 I 清宫性史5 I 人综合久合合 I 日本午夜免a费看大片中文4 I 成年轻人电影免费无码 I 另类小说第一页 I www.91色.com I 亚洲美女被黑人巨大在线播放 I 57pao国产一区二区 I 免费无码精品黄av电影 I 春日野结衣av I 亚洲va中文字幕无码毛片 I 亚洲一区二区视频在线观看 I 黄色日韩网站 I 操bbav I 超碰在线99 I 色多多网站入口 I 九色免费视频 I 大胸美女啪啪 I 综合久久成人 I 亚洲 国产 日韩 欧美 在线 图片 I 动漫美女穿透明内裤

環保誠信企業
Honor

TEL:+86 0536-6162866+86 187-6464-2379

ADD:No.19, Shunde Road, Zhucheng City, Shandong, China

WEB:www.starpaper.cn

Fertilizer sewage treatment plant

  • Fertilizer sewage treatment plant
    1. Fertilizer sewage treatment plant
  • MS:Katherine Wong

    +86 187-6464-2379

  • TEL:+86 0536 6162866

    MAIL:sales@cntianlang.com

  • 二維碼

Fertilizer sewage treatment plant

Name: Fertilizer sewage treatment plant

details

Note: The following are just a few common treatment methods. The specific processing method needs to be customized for you in combination with your situation. If you need detailed plans and quotations, please call our company service hotline, we have a dedicated technical staff to give you free programs and quotations.

At present, there are several types of sewage phosphorus removal technologies at home and abroad: biological methods, physicochemical methods and biochemical methods. The physicochemical method mainly includes coagulation sedimentation method, electrolytic dialysis method, reverse osmosis method, crystallization method and ion exchange adsorption method, etc. These methods have good phosphorus removal effect and stable operation, and are particularly suitable for treating high flow rate. Concentration of phosphorus-containing industrial wastewater.

Treatment process after workshop wastewater reform

The phosphorus-containing production wastewater flows into the regulating tank from the workshop, and the reaction agent lime milk is mixed with the wastewater before the pump, and then pumped to the reaction tank 1# to stir and mix the reaction (the mixture is automatically controlled by the pH measurement and control system to control the dosage of the lime milk. The pH was stabilized at about 11.0), and then the reaction was carried out through the reaction tanks 2# and 3# in sequence, so that most of the total phosphorus in the wastewater was precipitated and removed. After that, the wastewater is mixed by the swash plate to cause a coagulation reaction, thereby removing other pollutants and part of residual phosphorus in the wastewater.

Thereafter, the wastewater is subjected to secondary precipitation, sand filtration, and activated carbon adsorption treatment, and then enters the neutralization tank, and is neutralized with dilute hydrochloric acid to adjust the pH value and then discharged. After the precipitator precipitates, it flows into the air flotation device, and mixes with the injected flocculant to cause a coagulation reaction, thereby removing other pollutants and part of residual phosphorus in the wastewater. Thereafter, the wastewater is subjected to secondary precipitation, sand filtration, and activated carbon adsorption treatment, and then enters the neutralization tank, and is neutralized with dilute hydrochloric acid to adjust the pH value and then discharged.


Purchase Hotline: +86 187-6464-2379